“On behalf of Iona Management Services, I would like to thank Andidrain Ltd and your workforce for the planning and hard work that was done during the recent tank overhaul on our Anaerobic Digestion plant in Scotland. Andidrain were the perfect industrial services contractor to be selected for this project given we have worked together successfully on many previous projects throughout the UK. The close co-operation with myself and on site made it more achievable. I would fully recommend Andidrain for all AD tank clean out works & certainly look forward to working with you on future projects.”
The problem
The highway drains were overflowing during periods of significant rainfall, causing localised flooding and the public footpaths and verges that the highway drains ran underneath were due to be replaced.
The solution
A length of 3400m of mainly 150mm diameter highway carrier drain and associated road gullies and lateral connections were cleaned and surveyed using an Andidrain sewer cleaning recycler and CCTV Unit. The CCTV surveys identified some lengths of the carrier drain as being in poor structural condition and some lengths having root ingress. Root masses were cut and removed using a warthog and flail, followed by a complete clean of the system. To prevent root regrowth and further deterioration in the condition of the pipe, defective sections were lined using our UV (Ultra Violet) Pipe Lining rig, with lateral connections reopened using our remotely controlled robotic cutters.